Inclusive Beach ‘Dolphin’ Water Supply Completed

Experts from the KP «Odessa Coast» have successfully completed the connection of inclusive facilities at the beach «Dolphin» to the water supply network.

On May 27, work was completed on laying a centralized water supply network to the inclusive beach «Dolphin» and a connection point was provided to LLC «FOCUS LOGISTICS».

According to the technical documentation issued by the branch of «Infoksvodokanal» LLC «Infoks», necessary water consumption volumes for all social facilities (changing rooms, showers, public toilets) were taken into account, a new water supply network was laid, and existing communications were partially replaced.

On June 3, the internal networks of the inclusive beach «Dolphin» were connected to the newly laid pipeline, and water was supplied in test mode to social facilities (changing rooms, showers, public toilets).

After completing the necessary tests and adjustments, the operation and pressure of the new water supply system have been optimized.

Currently, the inclusive beach «Dolphin» is fully supplied with water for servicing socially significant facilities with inclusive elements.

7928 image for slide
7929 image for slide
7930 image for slide
7931 image for slide
7932 image for slide
7933 image for slide