Revival of the Water Supply: Odesa's Spring Returns

Today, we are pleased to announce that the water supply facility on Isaac Rabin Street in Odesa has resumed operations following a comprehensive renovation.

Since 2008, the municipal enterprise 'Service Center' has managed the facility. In early June 2025, operations were temporarily halted for major renovations.

During the renovation, plastic paneling was removed, and ceramic tiles were installed on the walls, new entrance doors were added, and the polycarbonate roofing was updated.

Specialists replaced outdated communication pipes and upgraded the stormwater drainage system. The old tiling was removed, and a new tiled surface, including tactile tiles, was laid.

The water dispensing area was completely refreshed, and a ramp for individuals with limited mobility was constructed.

In the facility's technical room, flooring renovations were carried out.

Additionally, electrical installation work was completed, and the ventilation system was upgraded.

Workers from the 'Service Center' also improved the surrounding area adjacent to the water supply facility.

10830 image for slide
10831 image for slide
10832 image for slide
10833 image for slide
10834 image for slide
10835 image for slide
10836 image for slide
10837 image for slide
10838 image for slide